From first conversation to finished space.
A glass enclosure project moves from consultation and site measurement through design, project coordination, production and installation. A typical on-site installation takes about 2 days; the full project schedule varies by scope and requirements.
What are the steps in a glass enclosure project?
- 01
Consultation
We listen to how you want to use the space, visit the site and measure the opening. This gives us a practical starting point for the design.
- 02
Design and quote
We recommend a system and prepare a project design and clear quote. Tempered glass is available in 5/16", 3/8" or 1/2" nominal thicknesses, selected for the project.
- 03
Permits and production
We coordinate the paperwork and next steps. Once project requirements are addressed, the system is made to measure.
- 04
Installation
Our own crew installs the system on site. A typical installation takes about 2 days.
A clear warranty
Open Space Glazing provides a 5-year materials warranty and a 2-year labor warranty. We explain the project-specific details as part of your proposal.
Questions about the right system, timing or site requirements? Contact us to discuss your project.
Read common questionsStart with a conversation.
Share your project details and we'll reply within 24 hours.