From first conversation to finished space.

A glass enclosure project moves from consultation and site measurement through design, project coordination, production and installation. A typical on-site installation takes about 2 days; the full project schedule varies by scope and requirements.

What are the steps in a glass enclosure project?

  1. 01

    Consultation

    We listen to how you want to use the space, visit the site and measure the opening. This gives us a practical starting point for the design.

  2. 02

    Design and quote

    We recommend a system and prepare a project design and clear quote. Tempered glass is available in 5/16", 3/8" or 1/2" nominal thicknesses, selected for the project.

  3. 03

    Permits and production

    We coordinate the paperwork and next steps. Once project requirements are addressed, the system is made to measure.

  4. 04

    Installation

    Our own crew installs the system on site. A typical installation takes about 2 days.

A clear warranty

Open Space Glazing provides a 5-year materials warranty and a 2-year labor warranty. We explain the project-specific details as part of your proposal.

Questions about the right system, timing or site requirements? Contact us to discuss your project.

Read common questions

Start with a conversation.

Share your project details and we'll reply within 24 hours.